In brief
A PV area describes where the modules are, which way they face and how high they are mounted. Depending on the PV system type, you enter ground-mounted systems, roof systems or facades. You draw the area on the map or import it from a KML file. Mark parts without modules as excluded areas (Ch. 7.7).
How precisely do I need to enter an area? You do not trace individual modules or module tables. A module table is the frame on which several modules are mounted in a row. The simulation assumes that the whole drawn area is covered with modules.
- One continuous area with the same orientation and the same module tilt is one PV area. For a ground-mounted system, one outline around the whole mounting area is often enough.
- If the orientation or module tilt differs, split the installation into several PV areas.
- Changes in terrain and cross tilt within one area are handled by the elevation grid and zones. You do not need to split the area for them (sections 7.5 and 7.6).
Ch. 3 states how many areas are possible per simulation.
7.1 Entering
You create each PV area in three parts: choose the type, draw the outline, enter the values.
- In the main menu, click "PV areas" and then "New PV area".
- In the "Select PV system type" window, choose the type, for example "Ground-mounted system" (section 7.2).
- A short drawing guide opens. Click "Start drawing".
- Draw the area on the map (see the table below). All corner points must lie within the project area. Press the Esc key to cancel.
- The input fields of the new area (for example "PV1") open in the menu on the left. Enter the orientation and the heights (sections 7.3 and 7.4).
- Choose the "Module type" (Ch. 8).
- For ground-mounted systems, check the terrain under "Terrain and cross tilt" (sections 7.5 and 7.6).
- Create paths, roof windows or ventilation units without modules as excluded areas (Ch. 7.7).
If any information is missing, the to-do list shows it. The simulation only starts once everything is complete.
How to draw.
| Type | How to draw |
|---|---|
| "Ground mount", "Roof mounted" | Click the corner points one after the other. To close the area, double-click, click point 1 or click "Finish" above the map. |
| "Roof parallel" | Three clicks: points 1 and 2 form the top edge, and point 3 sets the depth to the bottom edge. |
| "Facade" | Two clicks: start and end. The reflecting side is to the right of the drawing direction. If you draw from west to east, it faces south. |
For "Roof parallel" and "Facade", you can also type the length, direction and depth into the drawing banner above the map. This gives an exact rectangle. The same input is available when you draw obstacles (Ch. 10.1).
Example. A ground-mounted system on a meadow with the modules facing south: draw the outline of the module field and enter "Azimuth" 180°, "Tilt" 20° and the "Top edge" and "Bottom edge" from the plan.
Importing from KML (details in Ch. 4, section 4.8). Each polygon in the file becomes a separate area. PV-GlareCheck rejects polygons with holes; create cut-outs as excluded areas instead. You can use the elevation values from the file:
- for ground-mounted systems as the terrain elevation of the corner points; the area then lies on a best-fit plane,
- for roof systems either as the absolute roof height or as the terrain elevation.
Details: importing a CAD layout (DXF, DWG)
PV-GlareCheck does not read DXF or DWG files. The simplest way is to ask the project developer for the module areas as KML. Otherwise, convert the drawing with the free program QGIS:
- Open the DXF file via "Layer" › "Add Layer" › "Add Vector Layer".
- Assign the drawing's coordinate system (right-click the layer › "Layer CRS" › "Set Layer CRS"), e.g. ETRS89 / UTM 32N (EPSG:25832). A DXF file does not include one; the project developer knows which one applies.
- Select only the module areas, for instance via the CAD layer of the modules. If they are lines, convert them into areas with "Lines to Polygons".
- Right-click › "Export" › "Save Features As …" and choose the format "Keyhole Markup Language [KML]". QGIS converts the coordinates to geographic coordinates in the process.
- Upload the file in the editor under "PV areas" and check its position on the aerial image.
Elevation values from a CAD drawing are usually not terrain elevations (often 0). In that case, leave "Adopt elevation data" unticked on import; the terrain elevations then come from the elevation data (Ch. 6).
7.2 System types
The system type determines how you draw and what the heights refer to. You choose it when you create the area; you cannot change it later. If you chose the wrong type, create the area again.
GL stands for ground level, the height of the ground at a given spot.
| Type (in the selection dialog) | Used for | Height relative to |
|---|---|---|
| "Ground mount" ("Ground-mounted system") | installation on the ground, fixed or tracked | terrain at every point of the area |
| "Roof mounted" ("Roof system with tilted modules") | tilted modules on a roof, usually a flat roof | roof surface (plane through the roof heights of the corners) |
| "Roof parallel" ("Roof system with roof-parallel modules") | modules parallel to the roof surface | GL of the area |
| "Facade" ("Facade system / vertical PV") | vertical or tilted modules on a facade or fence, or free-standing | GL of the area |
7.3 Orientation and mounting
The orientation of the modules determines the direction in which they reflect sunlight. Two values describe it:
- The azimuth is the compass direction the modules face: 0° north, 90° east, 180° south, 270° west.
- The tilt is their angle to the horizontal: 0° is flat, 90° is vertical. It is always the angle to the horizontal, not to the slope.
How to enter the orientation:
- In the area's input fields, enter the "Azimuth" and "Tilt" from the planning documents.
- For "Roof parallel" and "Facade", PV-GlareCheck calculates the azimuth from the drawing. If it points the wrong way, "Swap top/bottom edges" or "Swap reflecting side" turns it by 180°.
- For ground-mounted systems, choose "Fixed mount" or "Tracking system (single-axis tracker)" under "Mounting type" (see below).
Example. Modules facing south-west and tilted at 25°: "Azimuth" 225°, "Tilt" 25°.
Dual orientation (east-west). In east-west systems, the module rows face opposite directions in pairs. For these, tick "Dual orientation". This adds the "Azimuth 2" field. It always lies 180° opposite the first azimuth; the tilt applies to both. In the report and for your plan, it counts as a single area.
Details: dual orientation in the calculation
PV-GlareCheck calculates two areas with the full outline, one for each direction. The illuminance therefore includes the full outline for each direction, not just half of the module rows; luminance and glare times are not affected. Mutual shading of the module rows within an east-west table is not calculated.
Tracked ground-mounted systems (trackers) (Pro). A tracker rotates the modules about an axis during the day so that they follow the sun. PV-GlareCheck calculates single-axis tracking. When the sun is low, the module rows can shade each other. Backtracking then turns the modules back. The GCR (ground coverage ratio) is the ratio of module width to row spacing.
- Under "Mounting type", choose "Tracking system (single-axis tracker)".
- Enter the "Axis orientation", i.e. the compass direction of the rotation axis. 0° means a north-south axis.
- Enter the "Module angle range", the maximum rotation angle to either side.
- Open "Tracking logic". Set "Backtracking" there and, if it is switched on, the "Ground coverage ratio (GCR)" and the "Rest angle". The rest angle is the smallest rotation angle during backtracking.
- Enter the tilt of the axis in the terrain (axis tilt) in the terrain menu (section 7.6).
All tracking parameters are required. A new tracker area receives initial values. If a value is missing, the to-do list reports it and the simulation does not start.
Details: tracker fields, initial values and calculation
| Field | Meaning | Initial value |
|---|---|---|
| "Axis orientation" | compass direction of the rotation axis; 0° = north-south axis | 0° |
| "Module angle range" | maximum rotation angle to either side | ±60° |
| Axis tilt | tilt of the axis in the terrain, set in the terrain menu (section 7.6) | 0° |
| "Backtracking" | in the "Tracking logic" panel: turning back when the sun is low | on |
| "Ground coverage ratio (GCR)" | module width / row spacing; only needed with backtracking | 0.5 |
| "Rest angle" | smallest rotation angle during backtracking; only needed with backtracking | 5° |
The simulation calculates the rotation angle for every time step (default 1 minute) from the sun position (pvlib). The twelve monthly curves under "Tracking logic" are only for checking and for the report. Stow, fault and special positions can be calculated as a fixed variant with the set angle as the tilt (Ch. 13). Ch. V.2, section V.2.5, describes the calculation in detail.
Custom schedule. A schedule lets you specify a different set angle from the calculated tracking for individual minutes, for example for a glare-reducing control strategy. In all other minutes, the simulation calculates according to the parameters. Download the schedule as an Excel file in the "Schedule" section under "Tracking logic", change only the "Setpoint" column and upload it again. If you then change the location, time zone or tracking parameters of the area, the to-do list blocks the start until you download and upload the schedule again or remove it.
Details: schedule step by step, checks and validity
- Download: Open "Tracking logic" and, in the "Schedule" section, choose "Download schedule (Excel)". The file contains one row for each minute with the sun above the horizon: the date without the year, the time in standard time, the calculated angle (locked) and the "Setpoint" column. If a schedule is already active, the file contains its setpoints, so you can edit it further.
- Adjust: Change only the "Setpoint" column.
- Upload: Choose "Upload adjusted schedule". PV-GlareCheck checks the whole file; the message lists any errors with the row number.
- Check: The panel then shows how many minutes on how many days have been adjusted and the largest deviation, together with the file name.
"Remove schedule" asks for confirmation and then restores tracking according to the parameters. The report and the results Excel file state the schedule (Ch. 14).
Checks on upload. PV-GlareCheck rejects the file if - it is not a readable Excel file or is too large (at most 25 MB), - it belongs to another project or area, - the area settings were changed after the download (check key on the "Info" sheet), - no setpoint differs from the calculated angle; the file is then not taken over as a schedule, and an existing schedule remains.
The message lists errors in individual rows with the row number: setpoint empty, not a number, a formula without a calculated value or larger than the angle range; invalid date or time; minute duplicated, out of chronological order or without the sun above the horizon. It lists missing minutes with their date and time. Setpoints are taken over to 0.01°.
Validity. A schedule is only valid for the location, time zone and tracking parameters it was downloaded with. If any of them changes, the to-do list blocks the simulation until the schedule is downloaded and uploaded again or removed. A replaced or removed file is deleted as soon as no simulation and no saved version refers to it. As long as a saved version contains the schedule, the file is kept.
7.4 Top and bottom edge
The heights define where the modules are in space. The "Top edge" is the higher module edge, the "Bottom edge" the lower one. What the height refers to depends on the system type:
| Type | Inputs |
|---|---|
| "Ground mount" | "Top edge" and "Bottom edge" of the modules, measured vertically above the terrain beneath each edge; for trackers in the stated tilted position |
| "Roof mounted" | GL of the area, roof height per corner point above GL ("Enter roof heights") and the top/bottom edge of the modules above the roof surface |
| "Roof parallel" | height of the top and bottom edge above GL |
| "Facade" | top and bottom edge above GL |
Example. A ground-mounted area with modules from 0.8 m to 3 m above the ground: "Bottom edge" 0.8 m, "Top edge" 3 m.
The top edge must be higher than the bottom edge; for "Roof parallel", both may be at the same height. For roof systems, a roof height of 0 counts as not entered.
For "Roof parallel", the tilt and the edge heights are linked. With "Auto-calculate", PV-GlareCheck determines one of the three values from the other two.
Details: tilt and edge heights for "Roof parallel"
tan(tilt) = (height of top edge − height of bottom edge) / horizontal distance between the edges.
7.5 Terrain under the area
A ground-mounted system stands on the terrain. For the modules to be at the right height, PV-GlareCheck needs the terrain elevation under the whole area. Only ground-mounted areas have a terrain menu for this.
- In the area's input fields, click "Terrain and cross tilt". The terrain menu opens with three steps.
- "Step 1" shows how the terrain elevations are taken into account: "Elevation grid" or "Best-fit plane" (see the table below). By default, PV-GlareCheck creates an elevation grid that follows the terrain.
- Leave "Calculate ground level automatically" switched on. PV-GlareCheck then fetches the elevations again after every change to the area. If the to-do list shows "Terrain not defined", the elevation grid is still missing; click "Create elevation grid". Once the grid exists, the button is called "Recalculate".
- Check the elevation map in step 1. It colours the area by the terrain elevation the simulation uses. The colours should match the slope on the aerial image: high at the top of the slope, low at the bottom.
A support point is a point inside the area where PV-GlareCheck queries the terrain elevation.
| Method | What happens | Suitable for |
|---|---|---|
| "Elevation grid" | terrain elevations at a grid of support points and at the corners; support points 25 m apart with a terrain model in the project or official elevations, 50 m apart with Google elevations | uneven terrain |
| "Best-fit plane" | one plane through the elevations of the corner points | flat or evenly sloping terrain |
If an elevation source does not respond, the values come from the next source in the chain, and the to-do list reports this. Ch. 6.2 describes where the elevations come from and how a planned change to the terrain is included.
7.6 Cross tilt
A module table is a row of modules on a shared frame. Its long direction is called the table axis; it runs across the direction the modules face. For modules facing south, the table axis therefore runs from west to east. If the table axis rises or falls, the table tips to the side. This sideways tilt is called cross tilt.
Example. Modules facing south (azimuth 180°):
- If the slope falls to the south, i.e. in the direction the modules face, the table axis stays level. There is no cross tilt.
- If the slope falls to the west or east, the table axis rises or falls with it, provided the tables follow the terrain. This is cross tilt. Here, a value of +5° means that the table slopes down to the west.
Cross tilt turns the reflection to the side and so shifts where it arrives. Over longer distances, even a few degrees make a difference. Without cross tilt, the table axis is level, even on sloping terrain.
Terrain or table? The automatically determined cross tilt describes the terrain under the area. Whether the tables follow it depends on the mounting structure. The planning documents state this; otherwise, ask the planner:
- If the tables follow the terrain, use the automatic cross tilt (see the steps below).
- If the tables are level along their axis although the terrain falls to the side, switch off "Account for cross tilt".
- If the planning documents give a specific value, switch off the automatic calculation and enter the value by hand.
How to set the cross tilt of a ground-mounted area:
- Open "Terrain and cross tilt" and go to "Step 2: Define cross tilt". Switch on "Account for cross tilt".
- If "Calculate cross tilt automatically" is on, PV-GlareCheck measures the cross tilt at many points in the area, the evaluation points. It takes the middle value, the median, as the "Median cross tilt". The value is determined again after every change to the outline or azimuth. To use a value from the planning documents, switch off the automatic calculation and enter the value by hand.
- Look at the "Spread". It shows how much the cross tilt varies within the area. Without zones, PV-GlareCheck calculates the whole area with the median. If the cross tilt varies a lot, zones represent the terrain more accurately.
- Zones are optional. To use them, go to "Step 3: Differentiated cross tilt" and switch on "Differentiated". The area is then divided into zones, each with its own cross tilt: automatically with "Derive zones from the terrain automatically", or by hand with "Draw a zone". Zones require an elevation grid and a terrain model in the project that covers the whole area.
The simulation calculates each zone with its own module orientation. In the report, the PV area remains a single installation.
Permitted values. Values from −45° to 45° are allowed. Values outside this range are rejected, and the previous value remains. If the terrain gives a larger value, the editor reports it. A positive value means the table slopes down towards azimuth + 90°, a negative value towards azimuth − 90°.
Details: sign and effective orientation
| Value | Slopes down towards | Example: azimuth 180° |
|---|---|---|
| positive | azimuth + 90° | slope down to the west (270°) |
| negative | azimuth − 90° | slope down to the east (90°) |
Azimuth, tilt and cross tilt give the effective azimuth and effective tilt, for example 180°, 30° and +10° → 196.7° and 31.5°. The editor, pre-analysis, simulation and report all use the same calculation.
Tracker. For trackers, step 2 is called "Define cross tilt (axis tilt)". Here, the cross tilt is the tilt of the rotation axis; values from −45° to 45° are allowed. Positive means that the axis slopes down in the axis direction. Values outside this range are rejected. If the terrain along the axis gives a larger value, the value is adopted and reported; the simulation stays blocked until the value is within range. There are no zones.
Roof mounted. Enter the cross tilt directly in the area's input fields.
The details at the end of the chapter describe how the median, spread and zones are calculated.
7.8 Points to note
- Aerial image as a template: "Google Satellite" in particular can be offset by several metres. Check the corner points against the planning documents (Ch. 5, section 5.4).
- Outline and orientation are independent. The module orientation comes from the azimuth, tilt and cross tilt, not from the drawn shape. A correct outline says nothing about whether the orientation is correct (Ch. V.2).
- Facades: The drawing direction determines the reflecting side; the orange marking shows it.
- Azimuth changed: The cross tilt applies across the orientation. With automatic calculation, the median and zones are determined again; for values entered by hand, the to-do list reports that they must be set again.
- Check the cross tilt against the planning documents: The value from the terrain only applies if the tables follow the terrain (section 7.6).
- PV areas do not block the view. In the simulation, PV areas do not count as obstacles to the view. If one area is meant to block the view of another, also enter it as an obstacle (Ch. 10.1).
Details: initial values and editing
Initial values of new areas. Ground mount: top edge 3 m, bottom edge 0.8 m, fixed mount, GL calculated automatically. Roof mounted: top edge 0.4 m, bottom edge 0.1 m above the roof surface. Roof parallel and Facade: azimuth from the drawing; Facade with a tilt of 90°. The module type is the first system module in the module list maintained by PV-GlareCheck.
Editing. Move corner points on the map; dragging the middle of an edge inserts a point (not for "Roof parallel" and "Facade"). For "Roof parallel", the corners slide along their edge, and the top and bottom edges stay parallel.
Details: calculation of the cross tilt (median, spread)
Where the elevations come from. This depends on step 1 and on the project. With a terrain model in the project, they come from its 1 m grid, regardless of any values entered by hand in the elevation grid. Without a terrain model, they come from the elevation grid of the area (corners and support points, linear in between), i.e. from the same surface the simulation uses. With "Best-fit plane", they come from the plane; the cross tilt is then the same everywhere and the spread is zero. If the area lies outside the terrain model, the cross tilt comes from the elevation grid, and step 1 says so; for zones, the model must cover the whole area. If no cross tilt can be determined, the field stays empty and red, the to-do list reports it and the simulation does not start; values entered by hand remain.
- Evaluation points: a 25 m grid inside the area; for very large areas at most 4,000 points, thinned out evenly.
- Tilt per point: five elevations along a 20 m measuring line on the table axis, 5 m apart. The slope is the median of the ten pairwise slopes, so a single wrong elevation, for example at the edge of an embankment, hardly shifts it. With fewer than three valid elevations, the point is dropped.
- "Median": the median of all evaluation points, rounded to 0.01°.
- "Spread": the range between the 10th and the 90th percentile, i.e. without the top and bottom ten per cent.
- Accuracy: An official terrain model with 1 m grid spacing, for example the DGM1 in Germany, has an elevation error of about ±20 cm. Over 20 m, this gives an uncertainty in the cross tilt of about 0.5°.
Details: cross-tilt zones (division, manual zones, calculation)
Zones from the terrain (step 3).
- The area is divided into squares of the "Zone size": default 25 m, adjustable from 10 to 100 m. In each square, the cross tilt is measured as in step 2, over a distance as long as the square, at most 20 m. If single tables stand on a narrow embankment at the edge, choose roughly the table length; at 25 m, the embankment merges into its flatter neighbour. The zone size applies per area and is saved with the project; changing it divides automatic zones again immediately.
- Each value is rounded to the "Step size": default 1°, adjustable from 0.5° to 10° in steps of 0.5°. If the step size is finer than the measurement accuracy, the editor points this out. The step size applies per area and is saved with the project. Changing the step size divides automatic zones again immediately; if no terrain model covers the area, the editor reports this.
- Adjacent squares in the same step form a zone, clipped to the outline. The edge strip without an evaluation point merges into the adjacent neighbour. If the terrain yields only one step, no zones are created and the median applies to the whole area.
- Fragments smaller than 350 m² merge into a neighbour; pieces are then merged until at most 12 zones remain. At 10 m, these are up to three squares, for example single cells at a ditch; from 15 m, single squares; at 25 m, only remnants clipped by the outline, because a full 25 m square is a measurement over a table length. To reach the zone limit, the piece with the smallest product of area and value difference to its neighbour merges first. Similar neighbours therefore merge first, and a steep edge made up of several squares remains a zone of its own. A piece always merges into the neighbour that shares an edge with it and whose value is closest to its own; in a tie, into the one with the longer shared border. A piece without neighbours remains a zone of its own.
- The value of each zone is the median of all evaluation points in it, rounded to the step size and recalculated after every merge.
- Zones are numbered from north to south, then from west to east.
With "Derive zones from the terrain automatically", the zones are recalculated after every change to the area. Drawing, changing or deleting a zone by hand switches the automatic division off. Every new automatic division follows the current method. Automatic zones divided with an older method keep their zones and values, and the simulation continues to use them. Step 3 and the terrain map point this out ("Zones from an older method"); the start is not blocked. The exception is zones from the first method: they have to be divided again, and until then an entry in the to-do list blocks the start. "Divide again" divides the area with the current method. "Keep existing zones" leaves the zones and values unchanged, switches the automatic division off and removes the notice, for example when a submitted report is based on these zones. If you change an area while the automatic division is on, it is divided again with the current method. Zones drawn by hand are not affected. When you switch to the best-fit plane, the zones disappear from the map but remain saved.
Zones by hand. A newly drawn zone starts with the median of the evaluation points inside it. If it contains too few terrain points or the value would lie outside ±45°, the editor asks for the value ("Cross tilt of the zone"); without an entry, the zone is not created. "Re-derive values from terrain" keeps the outlines and sets each zone to the median of the terrain across the current azimuth, sampled on a finer grid of 1 to 10 m depending on the size of the smallest zone; these values are not rounded to the step size. If a zone has fewer than three points or a value would lie outside ±45°, all values remain unchanged.
In the calculation. The zones only change the orientation of the modules; position and height still come from the elevation grid of the area. The simulation does not model individual tables. A zone border can therefore run through a table; each part then takes the cross tilt of the terrain beneath it. Where zones overlap, the steeper value applies; where there is no zone, the median applies. Sub-areas smaller than 25 m² are merged into the neighbouring area. The pre-analysis calculates an area with zones uniformly with the median.